Toshiba XLTR-200 Manuel d'utilisateur Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 99
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
10
3. Installing the Gateway
The gateway’s installation procedure will vary slightly depending on the chosen
mounting method and the networks that will be used.
3.1 Mounting
3.1.1 Panel Mounting
The included standoff kit allows for panel mounting of the unit. The standoff kit
is comprised of four 1” aluminum male/female standoffs and four #6 lock
washers.
1. Remove one of the four cover standoff retention screws and its lock
washer from the bottom side of the unit. DO NOT dispose of this screw
and washer, as they will be used later to mount the unit to the panel.
2. Install one of the male/female standoffs and a #6 lock washer from the
standoff kit through the unit’s circuit board and into the bottom of the cover
standoff. Refer to Figure 1.
aluminum standoffs
lock washers
lock washers
and screws
from step 1
gateway unit
p
anel
Figure 1: Standoff Kit Installation
3. Repeat steps 1 and 2 above to replace each of the three other cover
standoff retention screws.
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 98 99

Commentaires sur ces manuels

Pas de commentaire